Nichole Boultbee, Oliver Robson, Serge Moalli, Rich Humphries
Engineering 2018, Volume 4, Issue 2, Pages 260-266 doi: 10.1016/j.eng.2017.09.003
The Upper Lillooet River Hydroelectric Project (ULHP) is a run-of-river power generation scheme locatedThese HEFs are owned by the Upper Lillooet River Power Limited Partnership and the Boulder Creek Powerm long tunnel along the Upper Lillooet River Valley.The project is in a mountainous area; severe restrictions imposed by weather conditions and the presenceThis paper provides an overview of the project, a summary of the key design and construction schedule
Keywords: Run-of-river hydro project Power tunnel Umbrella support Canopy tubes Volcanic deposits Pumice Roadheader
Hydro Power Development at the Yalu Tsangpo River
Xu damao,Chen chuanyou,Liang weiyang
Strategic Study of CAE 2002, Volume 4, Issue 12, Pages 47-52
As the largest river in Tibet, the Yalu Tsangpo River (hereinafter referred to as the river) is abundantThe river has a “U”-shaped elbow in the Great Gorge area to form an ideal site for a giganticThe entire project will be divided into three phases with 12~15 GW implemented at each stage.The electricalThe cost estimated for the project is less than that of the Three Gorges project due primarily to theMeanwhile, the project will set four straight world records, namely, the largest hydropower station,
Keywords: the Yalu Tsangpo River hydropower development investment benefit
A Technical Review of Hydro-Project Development in China
Jinsheng Jia
Engineering 2016, Volume 2, Issue 3, Pages 302-312 doi: 10.1016/J.ENG.2016.03.008
This paper summarizes the development of hydro-projects in China, blended with an international perspectiveIt expounds major technical progress toward ensuring the safe construction of high dams and river harnessingcovers the theorization of uneven non-equilibrium sediment transport, inter-basin water diversion, giant hydro-generator
Keywords: Dam River harnessing Water diversion Pumped storage power station Underground cavern Ecological protection
Rational Understanding about Renaissance Path of China's Road and Bridge Engineering
Mao-run Feng,Zheng-song Zhao
Frontiers of Engineering Management 2014, Volume 1, Issue 1, Pages 42-51 doi: 10.15302/J-FEM-2014013
Keywords: road network expressway bridge project technological innovation construction management social management
Dongbin HU, Huiwu LIU, Xiaohong CHEN, Yang CHEN
Frontiers of Engineering Management 2019, Volume 6, Issue 4, Pages 575-583 doi: 10.1007/s42524-019-0044-1
Keywords: evolutionary game ecological compensation standard Xiangjiang River Basin
Lu Youmei
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 9-14
Keywords: Yangtze River Basin natural ecology ecological environment environmental protection
Shao Jianxiong,Liu Jingwang,Yuan Dafu
Strategic Study of CAE 2011, Volume 13, Issue 7, Pages 104-110
In view of the specified design conditions of Three Gorges Project (TGP), the main technical problems that should be considered in the design of hydro turbine generating unitsThe key technical researches performed are summarized and the parameters of hydro turbine generatingThe unit operation results indicate that the performance of the hydro turbine generating units is excellentTherefore, it is verified effectively that the general technical design of giant hydro turbine generating
Keywords: Three Gorges Project 700 MW hydro turbine generating unit unit capacity design and research operation
The Effect of Xiaolangdi Project on Environment in the Yellow River and its Countermeasures
Wang Jiayao,Zhang Zhenyu
Strategic Study of CAE 1999, Volume 1, Issue 2, Pages 47-51
The harnessing of the Yellow River has been paid serious attention to by every aspect of society.To start the construction of Xiaolangdi Project will make the harnessing of the Yellow River get intoResettlement is the key environmental issue of the project.The different application phases of the project will exert different influence on wetlands, the irrigationAfter the construction of the project, the increasing discharge of waste water in the section of Xiaolangdi
Keywords: Xiaolangdi project Yellow River ecological environment regional sustainable development geographic information
Fan Qixiang,Lu Youmei
Strategic Study of CAE 2010, Volume 12, Issue 8, Pages 30-36
Keywords: project management hydropower resources development of western regions Jinsha River
Xiaolangdi Water Conservancy Project of the Yellow River is Progressing Smoothly
孙国纬
Strategic Study of CAE 1999, Volume 1, Issue 1, Pages 87-87
Investigation of the hydro-mechanical behaviour of compacted expansive clay
Yujun CUI, An Ninh TA, Anh Minh TANG, Yingfa LU,
Frontiers of Structural and Civil Engineering 2010, Volume 4, Issue 2, Pages 154-164 doi: 10.1007/s11709-010-0019-0
Keywords: Romainville clay suction control oedometer test large infiltration task hydro-mechanical behaviour
Prediction of hydro-suction dredging depth using data-driven methods
Frontiers of Structural and Civil Engineering 2021, Volume 15, Issue 3, Pages 652-664 doi: 10.1007/s11709-021-0719-7
Keywords: sedimentation water resources dam engineering machine learning heuristic
The Decision-making & Practice of the Three Gorges Project
Lu Youmei
Strategic Study of CAE 2003, Volume 5, Issue 6, Pages 1-6
China Yangtze Three Gorges Project is a particularly giant hydro-development project in the worldComing through seventy years project planning, verifying and decision-making, this ten years constructionpractice has demonstrated that not only great progresses have been made within project implementationsedimentation, environment and resettlement is still waiting to be tested in the actual operation of the projectThis paper provides a brief introduction to the decision-making and practice of the Three Gorges Project
Keywords: Yangtze River Three Gorges Project decision-making practice
Tong Dawei
Strategic Study of CAE 2011, Volume 13, Issue 12, Pages 80-83
In this paper, 3D simulation model for the river closure is establishedcharacteristics at the closure-gap, a VR-based 3D dynamic visual-simulation of method for the complex process of riverIn this visual epresentation, comparison among different schemes of river closure is achieved easily.Therefore, a powerful visual tool for aiding river closure design and management can be provided.
Keywords: virtual reality river closure three-dimensional dynamic visual simulation
Farhoud KALATEH, Farideh HOSSEINEJAD
Frontiers of Structural and Civil Engineering 2020, Volume 14, Issue 2, Pages 387-410 doi: 10.1007/s11709-019-0601-z
Keywords: fuzzy finite element method saturated soil hydro-mechanical coupled equations coupled analysis uncertainty
Title Author Date Type Operation
Upper Lillooet River Hydroelectric Project: The Challenges of Constructing a Power Tunnel for Run-of-RiverHydro Projects in Mountainous British Columbia
Nichole Boultbee, Oliver Robson, Serge Moalli, Rich Humphries
Journal Article
Hydro Power Development at the Yalu Tsangpo River
Xu damao,Chen chuanyou,Liang weiyang
Journal Article
Rational Understanding about Renaissance Path of China's Road and Bridge Engineering
Mao-run Feng,Zheng-song Zhao
Journal Article
Research on the ecological compensation standard of the basin pollution control project based on evolutionarygame theory and by taking Xiangjiang River as a case
Dongbin HU, Huiwu LIU, Xiaohong CHEN, Yang CHEN
Journal Article
Three Gorges Project: a project for ecological improvement and environmental protection in Yangtze River
Lu Youmei
Journal Article
The design and practice of giant hydro turbine generating units of Three Gorges ProjectShao Jianxiong
Shao Jianxiong,Liu Jingwang,Yuan Dafu
Journal Article
The Effect of Xiaolangdi Project on Environment in the Yellow River and its Countermeasures
Wang Jiayao,Zhang Zhenyu
Journal Article
Project management of hydropower resource development in western China: case study on the lower reachesof the Jinsha River
Fan Qixiang,Lu Youmei
Journal Article
Xiaolangdi Water Conservancy Project of the Yellow River is Progressing Smoothly
孙国纬
Journal Article
Investigation of the hydro-mechanical behaviour of compacted expansive clay
Yujun CUI, An Ninh TA, Anh Minh TANG, Yingfa LU,
Journal Article
Research on dynamic visual simulation for construction process of river closure project based on virtual
Tong Dawei
Journal Article